Definition. Per-system cost vector [ftip-00L9]

For each system, the cost vector \(\mathbf c\) contains training FLOPs, inference FLOPs, wall time, memory, energy when available, and context length. The primary scalar \(C\) and its weights are declared beside the vector; omitted coordinates are marked unknown.